Partial Project List
For a sample of details, click here
| Project Name |
Estimated Construction Cost |
Owner |
Location |
Description |
Design Completed |
| Davenport Residence |
$500,000 |
M/M Davenport |
Dana Point, CA |
Remodel and addition to existing single family residence.
(drawings prepared using Revit®) |
6/11 |
| Paule Residence |
$150,000 |
M/M Paule |
Dana Point, CA |
Remodel and addition to existing single family residence.
(drawings prepared using Revit®) |
11/10 |
| Irv Seaver Motorcycles |
$1,200,000 |
Evan Bell |
Orange, CA |
Addition to existing motorcycle facility consisting of a
free standing block building, approximately 55'-0" x 70'-0". The roof
framing consists of clear span open web trusses.
(drawings prepared using Revit®) |
11/10 |
| Pearcy Residence |
$1,000,000 |
M/M Brian Pearcy |
Riverside, CA |
New Single Family Live-Work Facility
(drawings prepared using Revit®) |
04/11 |
| Morningside Remodel |
$750,000 |
Continuing Life Communities |
Fullerton, CA |
Expansion of Recreation Room and Dining Hall
(drawings prepared using Revit®) |
01/10 |
| Smith Residence |
$50,000 |
M/M Smith |
Laguna Niguel |
Removal of Existing Shear/Bearing Wall |
04/09 |
| Williams Garage and Patio
Addition |
$100,000 |
M/M Don Williams |
Riverside, CA |
Addition of two patio structures and one freestanding garage |
01/10 |
| Vaughn Residence |
$10,000 |
M/M Vaughn |
Dana Point |
Yes, I do small projects! |
02/09 |
| "The Catch" Restaurant |
$1,250,000 |
Joe Manzella |
Anaheim, CA |
Build-out of inline restaurant in a recently completed
multi-use structure. |
04/09 |
| Colburn Residence |
$50,000 |
M/M Colburn |
Orange, CA |
Remodel of existing single family residence |
12/08 |
| Fox-Seaward Duplex |
$1,500,000 |
M/M Fox |
Corona Del Mar, CA |
New residential duplex |
11/08 |
| Myers Residence |
$25,000 |
Al Myers |
San Clemente, CA |
Remodel of existing single family residence |
11/08 |
| Arby's Remodel |
$750,000 |
AT Properties |
Orange, CA |
Remodel of an existing commercial building |
10/08 |
| K
Hertfelder Residence |
|
M/M K Hertfelder |
Orange, CA |
Remodel to existing single family residence. |
11/08 |
| Jacob
Unit B |
$163,000 |
Nora Jacob |
Orange, CA |
New single family residence |
06/08 |
| Remodel
to Existing Boat Shack |
|
Lake Mission Viejo |
Mission Viejo, CA |
Modifications to Existing Boat Shack |
04/08 |
| New
Shade Structures |
$60,000 |
Lake Mission Viejo |
Mission Viejo, CA |
Replacement of Existing Shade Structures |
04/08 |
| Gomez
Residence |
$3,000,000 |
M/M Gomez |
Lemon Heights, CA |
New single family residence replacing
existing structure. |
05/08 |
| Meek Residence |
$25,000 |
M/M Meek |
San Clemente, CA |
Remodel to existing single family
residence. |
04/07 |
| Williams
Residence |
$240,000 |
Mike Williams |
Orange, CA |
New basement under existing relocated
historical residence. |
03/07 |
|
Carl's Jr. Restaurant |
$600,000 |
Carl Karcher Enterprises |
El Centro,
CA |
New restaurant
replacing existing restaurant destroyed by fire. |
08/07 |
|
18 Unit Apartment Complex |
$1,500,000 |
SBI Development Group |
Riverside, CA |
Two story wood framed structure consisting
of 12-1 BR and 6-2 BR apartments totaling approximately 13,600 SF; one two
story office/storage building approximately 540 SF; (4)-5 car
garage/carports and (1)-3 car garage. |
10/07 |
Opening in Existing Masonry Wall |
Less than $5,000 |
Heritage Christian Fellowship |
San Clemente, CA |
Provide a new window in existing exterior
masonry wall for a space that is being converted from storage to office. |
08/06 |
|
Carl's Jr. Restaurant |
$600,000 |
Carl Karcher Enterprises |
Blythe, CA |
New restaurant. |
02/07
|
Palm Springs
Family Clinic |
$2,900,000 |
County of Riverside |
Palm Springs, CA |
New, one story medical office building,
approximately 22,186 SF gross. |
09/06
|
|
Mecca Library
& Sheriff Substation |
$1,250,000 |
County of Riverside |
Mecca, CA
|
New, one story wood framed building
approximately 11,304 SF (gross). |
12/05
|
|
Moreno Valley Commerce Center |
$1,700,000 |
Raincross Ind. Properties, LLC |
Moreno Valley, CA |
Three industrial, one story tilt-wall
buildings. Two buildings are mirror images of each other and are
approximately 16,728 SF (102'-0" x 164'-0"). The third building
is approximately 20,976 SF (92'-0" x 228'-0"). |
06/04
|
|
Rubidoux
Family Care Clinic |
$2,900,000 |
County of Riverside |
Rubidoux, CA |
New, one story medical office building,
approximately 26,200 SF gross. |
09/04
|
| Farkas Residence |
$300,000 |
M/M Farkas |
Orange, CA |
Two story residence located near Old Town Orange, CA following Craftsman
design (raised floor, high pitched roof, etc.) |
8/04 |
| Hertfelder Residence |
$300,000 |
M/M Hertfelder |
Orange, CA |
Two story residence located near Old Town Orange, CA following Craftsman
design (raised floor, high pitched roof, etc.). |
2/04 |
|
Empire Office Buildings
|
$1,600,000 |
Stewart Group Development |
Riverside, CA |
3 office buildings, approximately 5,600 SF each, consisting of masonry
exterior walls and wood framed panelized roof. |
2/04 |
|
Towne Place Suites
|
$4,600,000 |
Campbell Motel Properties |
Rancho Cucamonga, CA |
Four story, wood framed hotel consisting of approximately
70,708 SF. |
11/04 |
| Mecca Family Medical
Center |
$2,500,000 |
County of Riverside |
Mecca, CA
|
New, one story medical office building,
approximately 22,500 SF gross. |
5/04 |
| Magganas Housing |
$1,000,000 |
|
Berkeley, CA |
3 story mixed use (apartments w/retail) structure. |
12/03 |
| Warehouse Improvements |
$250,000 |
Strebin Farms |
Montclair, CA |
Modifications to existing tilt-wall building including new rooftop HVAC
units and dock well (with dock levelers). |
4/04 |
| Kennel Expansion |
$500,000 |
Country Care Pet
Resorts |
Yorba Linda, CA |
Expansion to existing kennel facility. Project is a two story, 5,500 SF
addition with a floor constructed of metal deck and concrete fill
supported by steel beams, wood roof and masonry exterior walls (3 sides).
The fourth side is open to the existing facility. |
09/03 |
| Four Story Wood Framed Hotel |
$3,000,000 |
Wingate Inn |
Rancho Cordova |
Four story, wood framed hotel consisting of approximately 59,893 SF. |
01/03 |
| Four Story Wood Framed Hotel |
$3,100,000 |
Wingate Inn |
Phoenix, AZ |
Four story, wood framed hotel consisting of approximately 61,787 SF. |
03/02 |
| Four Story Wood Framed Hotel |
$2,300,000 |
Wingate Inn |
El Centro, CA |
Four story, wood framed hotel consisting of approximately 45,600 SF. |
04/01 |
| Classroom Addition to Existing Church Facility |
$500,000 |
Full Assembly Gospel of God |
Norco, CA |
New, two story classroom addition and remodel to existing sanctuary.
Framing consists of open webbed TrusJoist members. |
01/01 |
| Hyundai Showroom Addition |
$200,000 |
Victor Buick |
Corona, CA |
44'-0" square showroom building. The significant design feature of this project
is that it is designed as a Masonry Wall Frame structure in accordance
with the Strength Design Provisions of the 1997 UBC. |
|
| El Camino Mini Storage |
$2,500,000 |
Dahn Corporation |
Irvine, CA |
One story mini-storage facility consisting of approximately 106,183 square feet
including two story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
05/31/00 |
| Auto Center Service Buildings Addition |
$1,000,000 |
Victor Buick |
Corona, CA |
Two service buildings added to existing facility. These buildings are constructed of
masonry exterior walls and wood roof structure. The significant structural design feature
of these buildings are, due to the height of the walls, they are designed to minimize the
tributary seismic load on the wood roof diaphragms. Consequently, these walls were
designed using medium weight, high strength block, high strength (3,200 psi) light weight
grout and reinforcing spaced at 32". |
11/15/99 |
| Four Story Wood Framed Hotel |
$2,800,000 |
Wingate Inn |
El Centro, CA |
Four story, wood framed hotel consisting of approximately 55,000 SF. Project is
designed in accordance with 1997 UBC seismic provisions. |
10/13/99 |
| Napa Mini Storage |
$1,800,000 |
George Cohen and Associates |
Napa, CA |
One story mini-storage facility consisting of approximately 76,272 square feet
including two story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
11/30/98 |
| TownePlace Suites |
$3,500,000 |
Marriott |
Orem, UT |
Two-four story hotel structures consisting of approximately 69,365 square feet with
118 guestrooms. Project is designed in accordance with 1997 UBC seismic provisions. |
12/23/98 |
| Irvine Mini Storage |
$1,360,000 |
Dahn Corporation |
Irvine, CA |
One story mini-storage facility consisting of approximately 62,632 square feet
including one story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
10/22/98 |
| Equipment Enclosure |
$150,000 |
AirTouch Cellular |
Brea, CA |
22'-0" square block building enclosure for cellular equipment. |
04/20/98 |
| Equipment Enclosure |
$150,000 |
AirTouch Cellular |
Long Beach, CA |
22'-0" square block building enclosure for cellular equipment. |
04/17/98 |
| Smoketown Mini Storage |
$1,530,000 |
Dahn Corporation |
Prince William County, VA |
One story mini-storage facility consisting of approximately 70,573 square feet
including one story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
06/30/98 |
| Centreville Mini Storage |
$1,410,000 |
Dahn Corporation |
Fairfax County, VA |
One story mini-storage facility consisting of approximately 65,000 square feet
including one story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
05/27/98 |
| Maple Shade Mini Storage |
$1,030,000 |
Dahn Corporation |
Maple Shade, NJ |
One story mini-storage facility consisting of approximately 47,701 square feet
including one story office/residence. The structure consists of exterior block walls,
metal roof and metal wall/shear panels. |
03/04/98 |
| Fairfield Inn |
$1,940,000 |
Marriott |
Orem, UT |
One three-story motel structure consisting of approximately 38,662 square feet with 77
guest rooms, pool structure and porte cochere |
05/26/98 |
| TownePlace Suites |
$3,240,000 |
Marriott |
Fresno, CA |
Two three-story buildings consisting of approximately 58,858 square feet with 94
guest rooms. |
09/23/98 |
| Newport II Mini Storage |
$2,200,000 |
Dahn Corporation |
Newport Beach, CA |
Two story mini storage facility approximately 85,690 square feet consisting of block
exterior walls, composite metal floor deck, metal roof and interior metal wall
panels/shear walls. |
10/24/97 |
| Fire Damage Repair and Remodel |
$250,000 |
Arrowhead Property Management Company |
Santa Fe Springs, CA |
Reconstruction of existing tilt-wall building with panelized roof system, update to
current codes and accommodate new office layout. |
11/14/97 |
| Warehouse Building Foundation |
$120,000 |
Irvine School District |
Irvine, CA |
Foundation design for pre-engineered metal building. |
11/14/97 |
| Food Processing Facility |
$850,000 |
La Mexicana |
Vernon, CA |
One story 25,732 square foot tilt-wall building with panelized roof system and 6,530
SF mezzanine. Project also includes a 4'-0" loading dock. |
02/28/97 |
| Fairfield Inn |
$2,360,000 |
Marriott |
St. George, UT |
One three-story motel structure consisting of approximately 47,000 square feet with 99
guest rooms, pool structure and porte cochere |
05/06/97 |

|